Tuckahoe Bridge

  • Industry:
  • Service:
  • Duration: 4 Months
  • Location: Tuckahoe, MD

The piles on this new bridge were protected by the installation of FRP pile jackets and epoxy grout.

The 28ft jackets were installed as a single piece with no vertical or horizontal seams.

All work was accomplished from barges and platforms in an active river channel.