Prettyboy Dam

  • Industry:
  • Service:
  • Duration: 18 Months
  • Location: Parkton, MD

The project consisted of the drilling, installing, and stressing of an underwater anchorage system in water depths up to 100ft.

The anchorage system consists of 38ea bar anchors, ranging in length from 50ft to 70ft, and 12ea midwith holes.

SUS also installed six, 75,000lb precast concrete cross-beams that rested on fabricated stainless steel brackets.