Leesville Hydro

  • Industry:
  • Service: 5
  • Duration: 1 Month
  • Location: Leesville, VA

This project consisted of installing, testing and removal of temporary stop gates on an active spillway.

Our crew met challenges including: gate size and weight (72,000lbs) and fluctuation in pool elevation during periods of power generation (7ft).