Liberty Dam Inspection

  • Industry:
  • Service: 16
  • Duration: 3 Days
  • Location: Baltimore, MD

SUS was hired to perform underwater inspections on Liberty Dam. Working depths required access can be challenging and we have an array of mobile equipment that allows us to perform these inspections