DuPont Outfall

  • Industry:
  • Service:
  • Duration: 2 Weeks
  • Location: Edgemoor, DE

This project required the installation of a 1000ft, 16in diameter, HDPE outfall pipe.

Directional drilling was completed using an offshore support barge to drill and pull the main section of the line into place. The diffuser section was installed with 12, 1500lb concrete anchor blocks and set into place using a spreader bar system.