Holtwood Dam

  • Industry:
  • Service: 22, 23
  • Duration: 6 Months
  • Location: Holtwood, Pa

Subcontracted by Cianbro Corporation to assist with dam rehabilitation project consisting of: installation of steel sheet pile wall, underwater concrete forming and pouring, spillway and tailrace inspections, and stop log fabrication and installation.