Tuckahoe Bridge

1-855-SUS-DIVE

Edge
Bridges
Construction
Tuckahoe, MD
4 Months

The piles on this new bridge were protected by the installation of FRP pile jackets and epoxy grout.

The 28ft jackets were installed as a single piece with no vertical, or horizontal, seams. 

All work was accomplished from barges and platforms in an active river channel.